Work Days 2017 Mar 9&10

The pictures below were taken on 9 & 10 March 2017.  The new extension track path was dug to remove the grass to prepare it for filling with ballast.  The tunnel East entrance was worked on next – the dirt behind the side walls was dug out to about 3 feet behind the tunnel entrance.

 

??????????????

Before work began

MarkingTrackLocation_20170309_093631

Larry marking the track path

MarkingEastEnd_20170309_094758

Marking the East end

TrackPath_20170309_115506

Making Progress

Fixing a kink in the path

Fixing a kink in the path

Tunnel before starting work

Tunnel before starting work

Track hoe climbing up

Track hoe climbing up

Taking a stump out

Taking a stump out

Removing a pile of brush from the top of the tunnel.

Removing a pile of brush from the top of the tunnel.

View from the top side.

View from the top side. (This picture comes out rotated for some reason)

Taking out the big stump.

Taking out the big stump.

Grading the North side. A lot of dirt was moved here to fill in the hole that was here.

Grading the North side.  A lot of dirt was moved here to fill in the hole that was here.

North side finished grade.

North side finished grade.

??????????????

Grading the South side.